Free product launch plan generator: Your product launch plan, written from your website

Enter your website address and describe what you are launching. Mark writes your launch plan: the positioning, the message, the timeline from day -30 to day +30 and the first launch content, from the announcement email to the sales pitch.

The product or feature, who it is for, what changes (60 characters at least). The plan is kept for 7 days, visible only to people who have the link. 0 / 1,500 characters
Each action gets its date.

Free, no sign-up. Results in 1 to 2 minutes.

Key takeaways in 30 seconds

A product launch plan tells your team who the launch is for, what you say, when you act and how you measure.

  • A product launch plan covers 5 steps: positioning, message, timeline, content and measurement.
  • Pick the launch tier first. A major launch needs more channels and more time than a minor update.
  • Start preparing at day -30 and keep working until day +30.
  • Marketing, sales and product share 1 key message, 1 sales pitch and 1 objection FAQ.
  • Track launch page visits, sign-ups or demo requests, adoption by existing customers and sales feedback.
  • The free generator reads up to 5 pages of your website and writes a plan with a day for each action, plus your first launch content.

Your product is ready, but the launch still lives in a shared doc full of ideas. A product launch plan fixes that. It sets who you target, what you say and what happens each day. Start from a product launch plan template and you skip the blank page.

Then there is the message. Marketing writes one version, sales tells another story on calls, and product lists features. Prospects hear 3 versions and remember none.

Launch day comes. You post once, send 1 email, and the week goes by. Nobody notices. A plan spreads the work over 61 days, so your launch keeps working after day 1.

What a product launch plan is

A product launch plan is a dated document. It lists the audience, the message, the actions by channel and the metrics. It covers the weeks before launch day and the weeks after. Every team works from the same version.

Go to market strategy, product launch, launch plan: the words

These terms overlap, so set them straight with your team:

  • Go to market strategy: the long-term choices for a product. You pick the market, the audience, the sales model and the channels.
  • Product launch strategy: the choices for one launch. You pick the tier, the audience, the message and the channels.
  • Launch plan: the dated actions that put this strategy to work.
  • Product launch checklist: the short list of checks before launch day.

A go to market strategy template frames your market for the year. A launch plan template turns one launch into a calendar.

The 3 launch tiers: major, medium, minor

The tier sets your channels, your effort and your timing:

  • Major launch: a new product or a new market. You use every channel, the press and a full sales training. Start at day -30 or earlier.
  • Medium launch: a new offer or a key feature for customers and prospects. You use email, the blog, LinkedIn and a sales pitch.
  • Minor update: an improvement to an existing product. A short email to the customers concerned and a product note are enough.

Choose the tier before anything else. Otherwise you spend major launch energy on a minor update. In the generator, the tier sets the size of the timeline: up to 4 actions per phase for a major launch, 3 for a medium launch and 2 for a minor update.

The product launch plan template: 5 steps

Use the same 5 steps for every launch. Only the depth changes with the tier.

StepQuestion to answerDeliverable
1. PositioningWho is it for, what problem does it solve, and why believe you?Audience, problem, promise, proof and difference in 5 lines
2. MessageWhat 1 sentence should everyone remember?Key message and its 3 pillars
3. TimelineWhat happens when, and on which channel?Calendar in 4 phases, with days and channels
4. ContentWhat does each audience read, and when?Launch page, email, LinkedIn post, sales pitch, FAQ
5. MeasurementHow will you know the launch worked?Up to 4 metrics and a review date

Write the positioning first, because every other step depends on it. If you can't name the proof, your message will sound like a promise with nothing behind it.

The launch timeline, from day -30 to day +30

A product launch strategy works when actions start early and continue after launch day.

PhaseWhenActionsChannels
PreparationDay -30 to day -15Write the positioning and the message, brief the content, book the sales trainingInternal docs, team meeting
Pre-launchDay -14 to day -1Tease the launch, collect beta customer quotes, finish the launch page, train salesLinkedIn, customer email, blog
Launch dayDay 0Send the announcement, put the page live, publish the post and the press releaseEmail, website, LinkedIn, press
After the launchDay +1 to day +30Send follow-up emails, share customer stories, review feedback and metricsEmail, LinkedIn, sales calls

After the launch, a short email sequence keeps the news alive. The lead nurturing email generator helps you write it.

A full example for a fictional company

Quotebarn is a fictional quoting software for contractors. It launches a mobile app, as a major launch. All the figures in this example are made up.

  • Positioning: for contractors who quote on site, the Quotebarn app sends a quote from the phone before they leave the customer's home.
  • Key message: “Quote on site, get signed before you leave.” The 3 pillars are speed, the same price list as the desktop version and signature on site.

A sample of the actions, 2 per phase (a major launch can hold up to 4):

  • Preparation: the product team validates the positioning at day -30. Marketing recruits 40 beta contractors at day -25.
  • Pre-launch: at day -10, existing customers get an early access email. At day -5, sales train on the 3 main objections.
  • Launch day: the announcement email goes to all customers. A LinkedIn post shares a quote from a beta contractor.
  • After the launch: at day +7, customers who haven't installed the app get a reminder. At day +30, the team reviews metrics and sales feedback.

Launch content: what to prepare

Each piece of content has one audience and one moment. Plan both.

ContentAudienceTiming
Launch pageProspects and customersReady at day -3, live at day 0
Announcement emailCustomers and subscribersDay 0
LinkedIn postProspects, your network, your employeesDay 0, then day +7
Press releaseJournalists and partnersDay 0, for major launches
Sales pitchSales teamDay -7, before the training
FAQProspects, support and salesDay -3

For the press release, use the press release generator. For posts and carousels, try the LinkedIn post generator.

Align marketing, sales and product

When each team says something different, prospects remember nothing. Fix it with 4 simple tools:

  • 1 message: write the key message once. Every piece of content starts from it.
  • The sales pitch: 3 to 5 sentences that sales can say out loud on a call.
  • The objection FAQ: list the questions sales hear most and answer each in 2 sentences.
  • A team check-in before launch day: 30 minutes at day -3, with marketing, sales and product around the same plan.

Your brand messaging framework gives the base for the message. The communication plan generator helps you schedule the rest of the year.

Product launch checklist: what to check before launch day

Run this product launch checklist at day -3:

  1. The positioning fits in 5 lines and everyone has read it.
  2. The key message and its 3 pillars appear in every piece of content.
  3. The launch page is ready, tested on mobile and linked to a form.
  4. The announcement email is written, tested and scheduled.
  5. The LinkedIn post is approved and ready to publish.
  6. Sales have the pitch and the objection FAQ.
  7. Support knows the product and has the FAQ.
  8. Each action in the timeline has an owner and a date.
  9. The tracking is in place on the launch page and the forms.
  10. The team has agreed on a date to review the results.

Measure the launch

Choose your metrics before launch day. Then compare each launch with your previous one, because your history is the only fair benchmark.

  • Launch page visits: did people come, and from which channel?
  • Sign-ups or demo requests: did visitors take the next step?
  • Adoption by existing customers: did current customers start using the new product?
  • Feedback from sales: what do prospects say, and which objections come back?

Review these metrics at day +7 and day +30. Adjust your follow-up content based on what you see.

How to write your launch plan with the generator

The free generator writes a full plan from a few lines. Here is how it works:

  1. Describe your launch. Enter your website address and describe the launch in 60 to 1,500 characters. Say what you launch, who it is for and what changes.
  2. Pick the size. Choose a major launch, a medium launch or a minor update. Add the launch date if you know it. You don't need to sign up.
  3. Let Mark read your site. Mark reads up to 5 pages of your website: home, about, offers and articles. It learns your offer, your customers and your brand's tone. Then the AI writes the positioning, the key message and its 3 pillars, the 4-phase timeline with actions by channel and the metrics.
  4. Get your first content. You receive the announcement email (subject and body), a LinkedIn post and the top of your launch page (headline, subheadline, button). You also get the sales pitch, up to 3 FAQ questions and answers, and a checklist for the last days. Copy the whole plan or each piece of content.

What the generator never invents

The AI is told to stick to your description and your pages. The page then removes any sentence that cites a key figure, a date, a quote, a person, a customer, a partner, an award, a beta or an offer missing from both. An AI can still misread a detail, so review the plan with your team before you launch.

With a launch date, each action gets its own date. Your description stays private: the plan is kept for 7 days and only people with the link can see it.

Mistakes to avoid

  1. Launching without a precise audience. “Everyone” is no audience. Name the role, the company type and the problem.
  2. A different message per team. Write 1 key message and share it before any content goes out.
  3. Betting everything on launch day. Launch day is 1 day out of 61. Plan the weeks before and after.
  4. Forgetting existing customers. They adopt first and speak for you. Tell them before the public.
  5. Not measuring after the launch. Without a review at day +30, you repeat the same mistakes next time.

How to apply this today

  1. Write your launch in 3 lines: what it is, who it is for and what changes.
  2. Pick the tier: major launch, medium launch or minor update.
  3. Fill in the 5 positioning lines: audience, problem, promise, proof and difference.
  4. Write 1 key message and its 3 pillars, then share them with sales and product.
  5. Put the 4 phases in your calendar, from day -30 to day +30, with an owner per action.
  6. Book a 30-minute team check-in at day -3 and a results review at day +30.

Frequently asked questions

What is a product launch plan?

A product launch plan is a dated document for one launch. It sets the positioning, the message, the actions by channel and the metrics. It usually covers day -30 to day +30.

What is the difference between a go to market strategy and a marketing plan?

A go to market strategy defines how a product reaches its market: audience, sales model and channels. A marketing plan lists all marketing actions over a period, often a year. A launch plan applies both to one launch.

When should you start preparing a launch?

Start around day -30 for a medium launch. A major launch often needs more time. A minor update can be ready in a few days.

What content do you need for a launch?

Prepare a launch page, an announcement email, a LinkedIn post, a sales pitch and an FAQ. Add a press release for a major launch.

How do you choose the launch date?

Pick a date when your team is available for the 2 weeks after it. Avoid holidays and dates that clash with your large events. Leave time for the sales training before it.

How do you measure a product launch?

Track launch page visits, sign-ups or demo requests, adoption by existing customers and feedback from sales. Compare the results with your previous launch. Review them at day +7 and day +30.

Does the generator invent information?

It is told not to, and the page removes any sentence that cites a key figure, a date, a quote, a person, a customer, a partner or an offer missing from your description and your pages. An AI can still misread a detail, so review the plan with your team before you launch.

Start your launch plan now

A launch works when every team says the same thing at the right time. Run the free generator and get your plan, your timeline and your first content in 1 to 2 minutes. Then go further with Mark AI: it writes all your launch content in your brand voice, from the launch page to the emails, the posts and the press release. Your team reviews everything before anything gets published.

Write my launch plan